Pipeline Construction Monitoring - Foothills West Path Delivery (Turner Valley, Longview & Lundreck)

CLIENT: TC Energy


AJM was contracted by TC Energy in 2023 to provide environmental monitoring support for the construction of the Turner Valley, Longview, and Lundbreck sections of the Foothills West Path Delivery natural gas pipeline system in southwestern Alberta. 

The scope of work provided by AJM included: 

  • Early season raptor surveys to follow Restricted Activity Period (RAP) timing; 

  • Pre-construction migratory bird nest sweeps; 

  • Amphibian mitigation guidance and salvages; 

  • Mountain Goat and Bighorn Sheep surveys and mitigation on Lundbreck; and 

  • Assisting Environmental Inspectors with implementation of Environmental Protection Plans. 

AJM assisted TC Energy in complying with the Migratory Birds Convention Act, the Alberta Wildlife Act, and Species at Risk Act. AJM implemented mitigations for many migratory bird species including two species listed under the Species at Risk Act (SARA); the olive-sided flycatcher (Contopus cooperi) and bobolink (Dolichonyx oryzivorus). AJM provided environmental support to support pipeline development while providing appropriate mitigations to meet regulatory requirements. Additionally, AJM aided TC Energy of implementation of the Environmental Protection Plan developed for this pipeline project.  This project was a Canada Energy Regulator (CER) regulated project.  


Other Projects

Previous
Previous

Bleriot Ferry Rehabilitation Project

Next
Next

Bathymetric Survey