Projects

Here's just a small sampling of the awesome projects we’ve been grateful to work on over the years.

Bleriot Ferry Rehabilitation Project

Jamac Painting & Sandblasting Ltd. (Jamac) retained AJM to provide environmental consulting for the Bleriot Ferry Rehabilitation Project near Munson, AB in 2023. Critical deliverables were to include:

• Environmental Construction Operations (ECO) Plan; 

• Bird Management Plan (BMP), including a Wildlife Survey and Sweep of the area; and 

• Weed Survey and Weed Infestation map. 

AJM crafted an ECO plan compliant with current laws, regulations, permits, and the ECO Plan Framework. It covered all environmental aspects identified by the Environmental Risk Assessment, including Clubroot and Whirling Disease control methods, a Temporary Erosion and Sediment Control Plan, and a Bird Management Plan (BMP). The plan, once reviewed and revised in response to the Project administrator's feedback, included a Clubroot Management Plan adhering to Alberta Agriculture standards and a Whirling Disease protocol based on AEP guidelines.

Read More

Pipeline Construction Monitoring - Foothills West Path Delivery (Turner Valley, Longview & Lundreck)

AJM was contracted by TC Energy in 2023 to provide environmental monitoring support for the construction of the Turner Valley, Longview, and Lundbreck sections of the Foothills West Path Delivery natural gas pipeline system in southwestern Alberta. 

The scope of work provided by AJM included: 

  • Early season raptor surveys to follow Restricted Activity Period (RAP) timing; 

  • Pre-construction migratory bird nest sweeps; 

  • Amphibian mitigation guidance and salvages; 

  • Mountain Goat and Bighorn Sheep surveys and mitigation on Lundbreck; and 

  • Assisting Environmental Inspectors with implementation of Environmental Protection Plans. 

AJM assisted TC Energy in complying with the Migratory Birds Convention Act, the Alberta Wildlife Act, and Species at Risk Act. AJM implemented mitigations for many migratory bird species including two species listed under the Species at Risk Act (SARA); the olive-sided flycatcher (Contopus cooperi) and bobolink (Dolichonyx oryzivorus). AJM provided environmental support to support pipeline development while providing appropriate mitigations to meet regulatory requirements. Additionally, AJM aided TC Energy of implementation of the Environmental Protection Plan developed for this pipeline project.  This project was a Canada Energy Regulator (CER) regulated project. 

Read More

Wildlife and Aquatic Services for Road & Bridge Construction

Farmboy Landscaping and Maintenance (Farmboy) retained AJM to provide ongoing wildlife and aquatic services for various road and bridge construction projects from 2021 to present. AJM’s support includes but is not limited to Environmental Construction Operations (ECO) Plan development, wildlife surveys and sweeps, migratory bird nest sweeps, water quality monitoring (total suspended solids testing), monitoring water diversion activities, QAES support, and fish salvages.

Read More

Pre-Development Assessments for Oil & Gas Development on Department of National Defense Canadian Forces Base (CFB) Suffield

AJM has developed a strong working relationship with one of its international oil and gas exploration and production clients to assist their development team with overcoming environmental and regulatory challenges and approvals with new energy development projects, specifically on the Canadian Forces Base (CFB) Suffield in southeastern Alberta.  

The current scope of work includes:

  • Desktop review of background environmental data;

  • Scouting of best routes and locations for placement of pipelines and well sites;

  • Completion of field assessments including wetlands, wildlife, and vegetation;...

Read More

Douglasdale Park Habitat Management Plan

AJM was contracted by the City of Calgary’s Parks and Open Spaces Unit to produce a ten-year Habitat Management Plan for Douglasdale Natural Environment Park, a 47ha park located adjacent to the Bow River in southeast Calgary. The primary objective of a Habitat Management Plan is to outline a clear strategy and timeline for the management of the ecological health and function of the park, and to ensure that biodiversity and climate resilience outcomes can be achieved more effectively. 

The scope of work included reconnaissance site visits to the park and a thorough desktop review of background data, including ecological surveys, health assessments, biophysical impact assessments, historical aerial photos, and GIS data. AJM worked in collaboration with the City of Calgary to incorporate contributor engagement from various stakeholders, including public park users.

Read More

Integrity Dig Program

AJM's involvement in integrity dig projects encompasses identifying environmental prerequisites for wildlife, wetlands, aquatic life, vegetation, and soil within Alberta. Initially, a thorough desktop review is performed to ascertain these requirements. The identification of wildlife requirements is conducted in accordance with the Public Lands Act, Wildlife Act, Species at Risk Act, and Migratory Birds Convention Act. Supporting field assessments for these acts involve Wildlife Surveys, Wildlife Sweeps, and Migratory Bird Nest Sweeps.

Read More

Environment & Regulatory Support - Drilling Programs

AJM has developed strong working relationship with clients as a member of their development teams (e.g., development engineers, surface land, facilities, earthworks, etc.) to handle the environmental and regulatory challenges with new energy development. Projects have included coordinating approvals (including, but not limited to, Water Act, Public Lands Act, Historical Resources Act, and Wildlife Act); providing updates to the development teams as to the status of environmental assessments and applications; conducting wetland, wildlife, vegetation, and archaeological field assessments; reviewing environmental assessment reports on clients’ behalf; and collecting and submitting environmental information for Directive 56 well license approvals.

Read More

Blackgold Project - Updated Wetland & Water Body Monitoring Programs

Modified Harvest’s existing Wetland and Water Body Monitoring Program to be more in-line with industry standard. AJM was able to realize a decrease in the scope and potential cost of the monitoring program through a more focused data collection approach. Worked closely with the AER on the proposed modifications to the existing program to ensure buy-in from the regulator throughout the project.

Read More

Wetland Assessments & Water Act Applications Under the Alberta Water Act

Complete field wetland assessments including delineation and classification according to the then Alberta Wetland Classification System. Complete wetland heath assessments and ABWRET-A documentation to support both Code of Practice for Pipelines and Telecommunication Lines Crossing a Waterbody, and Water Act approvals for permanent disturbance. Work with regulators through new wetland assessment and reporting requirements, and guide clients through the various assessment and regulatory changes. Since 2012, AJM has completed over 200 COP notifications for pipelines crossing wetlands, 40 Water Act applications for wetland disturbance, and assessed approximately 500 lease sites and tie-in pipelines for wetland-related issues.

Read More

At a Glance

  • Consulting Services

    AJM specializes in wetland, wildlife, vegetation, aquatic and GIS services including pre-development assessments, regulatory applications and monitoring programs.

  • Software Development

    Through our in-house software development team, we provide innovative solutions to meet your environmental needs.

  • Projects

    AJM has worked on a variety of projects and is grateful for our clients trust. We take immense pride in our project experience from within a diverse group of industries including oil & gas, mining, government, non-profit and beyond.

  • Safety

    AJM considers a project a success when completed safely, on time and on budget. None of our work is so important that we cannot take the time to do it safely.